|
|

Main Projects Carried
Out by Silvestre-Engineering
* CHOCOLAND FACTORY *
Total area: 66,000 square feet
This is a new project and construction is expected to begin soon.
This building is located in an area close to Disney and is basically
a chocolate
factory with a tourist park on the second floor.
This is a very high three-story building: approximately 20 feet per
floor.
The architectural design is basically a chocolate box with a
semi-opened and sloped roof framing system.
* OFFICE BUILDING IN DOWNTOWN ORLANDO *
Total area: 42,000 square feet
This is a three-story remodeling project. The original building was
built approximately 90 years ago and was remodeled and updated at
least 2 or 3 times over the years.
The additional challenge was to keep the original style, details and
design because it is a building located in a place considered
historic heritage.
To reinforce the structure, it was necessary to use a combination of
structures made of concrete, metal and wood.
Silvestre Engineering was in charge of the engineering field
supervision during construction time.
* ORLANDO DOWNTOWN ENTERTAINMENT *
Total area: 49,500 square feet
This is a project in which a new addition merged with the remodeling
of another area.
A very detailed shoring technique was developed because it had an
adjacent four-story 70-year old building.
The structural design was achieved with a combination with concrete,
steel, and natural and pre-engineered timber wood.
Silvestre Engineering was in charge of the engineering field
supervision during construction time.
* HOLIDAY INN SUNSPREE RESORT *
Total area: 264,000 square feet
Existing 6-story building for complete remodeling. The overall
schedule was set in three phases being the first of them completed
by now.
An extensive and comprehensive inspections and testing of the
structure was carried out during the preliminary stage of this
project in which serious structural failures were found.
Those finding showed a total lack of capacity or resistance for wind
loads forces being necessary to recalculate this building to bring
it up to current Florida Building Code.
The entire structure was reinforced with an additional and parallel
structure with a steel framing system capable of compensate those
calculation deficiencies.
In this specific case, it was also necessary to reinforce the
foundations in some critical design areas.
Silvestre Engineering was in charge of the engineering field
supervision during construction time.
* MISSION HOPE CHURCH *
Total area: 51,700 square feet
This is a project in which a new section is combined with the
remodeling of another.
The structural design was achieved with a combination of concrete,
steel, and natural and pre-engineered wood.
The top ceiling design was achieved with Timber Trusses, which is a
lattice structure of brushed wood with metal plates, as it is an
exposed structure.
* PIZZA HUT
EAST OF ORLANDO *
Total area: 24,200 square feet
This is a two-story remodeling project.
A concrete and steel structure was combined.
* SHOPPING PLAZA SUBWAY / TROPICAL SMOOTHIE
*
Total area: 35,200 square feet
Complete 2-story remodeling project.
The existing structure was scanned to determine the necessary
reinforcements that were made with a combination of concrete and
steel framing structures.
Silvestre Engineering was in charge of the engineering field
supervision during construction time.
* ALTAMONTE SPRING SURGICAL CENTER *
Total area: 30,800 square feet
New 2-story project based on concrete blocks, cast in place concrete
and steel framing decks plus columns and beams.
* LAKE MARY OFFICES AND WAREHOUSE *
Total area: 69,300 square feet
New 2-story project based on the construction of concrete blocks,
steel framing and pre-fabricated hollow slab system.
* OVIEDO MAGNOLIA CENTER: TECHNICAL SCHOOL
AND OFFICES *
Total area: 90,000 square feet
Three story building with an “Insulated Concrete Forms” wall system
“Amvic ” and cast in place concrete slabs “Amdeck”.
|